What is Change order?

A change order is a signed approval that changes a job's scope or price after the estimate is accepted. What to include, an example, the California rule.

Updated October 15, 2026 · 5 min read

Definition

A change order is a written, signed agreement that changes the scope, price or schedule of a job after the customer accepted the original estimate or contract. It describes the added or removed work, states the amount added to or subtracted from the price and any effect on the schedule or payments, and is signed before the changed work starts.

Also called: CO, contract modification, extra work order, variation (UK)

Used when
Scope, price or schedule changes after approval
Must state
The change, the price difference, the schedule effect
Signed
By the customer, before the changed work starts
California home improvement
Required in writing and signed before work (B&P Code § 7159)
Best evidence
Photos showing why the change is needed

Every contractor has had the job where the customer agreed to $6,800, the crew found rotted framing behind the old unit, someone said "go ahead" in the driveway, and the final invoice of $8,150 turned into a two-week argument. Change orders exist to make sure that conversation happens before the extra work, in writing.

Change orders in plain English

An electrician is installing an EV charger circuit for an agreed $1,450 (example numbers). When the panel cover comes off, there's no room for a new breaker without replacing two breakers with tandem units, or adding a subpanel. The electrician stops, photographs the panel, and writes a change order: "Add subpanel to provide space for EV circuit. Add $780. New total $2,230. Adds half a day; completion moves from Tuesday to Wednesday." The homeowner signs on the tablet, and work continues.

What should a change order include?

Change order contents

  • Reference to the original estimate, contract or job number
  • A change order number (CO-1, CO-2) so changes stay in sequence
  • Plain description of the work added or removed
  • Why the change is needed, with photos where possible
  • Price added or subtracted, and the new contract total
  • Effect on the completion date and any progress payments
  • Customer signature and date, collected before the changed work starts

Worked example: a job with two changes

Item (example)AmountRunning total
Original contract: 3-ton heat pump replacement$11,400$11,400
CO-1: replace damaged return plenum found at tear-out+$640$12,040
CO-2: customer keeps existing thermostat (remove smart thermostat)−$385$11,655
Final invoice$11,655

The final invoice should tie to the original contract plus every signed change order. If it doesn't, something was done without one.

When is a change order legally required?

Rules vary by state and type of work. California's home improvement law is one of the most specific. It says changes to a home improvement contract must be in writing and signed by the parties before the work covered by the change begins, and that extra work or a change order isn't enforceable against the buyer unless it states, in writing and before work starts, the scope of the work, the amount added or subtracted, and the effect on progress payments or the completion date.1

In U.S. federal contracting, a change order has a narrower meaning: a written order, signed by the contracting officer, directing the contractor to make a change that the contract's Changes clause allows without the contractor's consent.2 Residential and light commercial work usually works the other way round, with the customer agreeing to the change.

What causes change orders, and how to reduce surprises

CauseExampleHow to reduce it
Hidden conditionsRotted subfloor, undersized wiring, failed flueInspect and photograph before quoting; state exclusions
Customer changes their mindDifferent unit, extra outlet, keep old fixtureConfirm selections in writing before ordering
Code or inspector requirementsInspector requires an added disconnectNote known code items in the original estimate
Equipment availabilitySpecified model unavailableName an approved alternate in the contract

A clear original estimate prevents more disputes than a good change order fixes. State what's included, what's excluded and what happens if hidden conditions turn up. Our HVAC estimate template has a layout to start from.

 What it isWhen it's used
Change orderSigned change to agreed scope or priceAfter the original agreement, before the changed work
New estimateA proposal for separate workNew job, nothing agreed yet
Progress billingInvoicing a large job in stagesInstalls and projects with milestones
Not-to-exceed amountA cap on a time-and-materials billUnknown-scope work

Change orders also matter for job costing: the added revenue and the added labor and materials belong to the same job, or the job's margin looks wrong. On staged projects, each signed change also changes what's left to bill under progress billing.

Making change orders fast in the field

  1. 1

    Stop before the extra work

    Make it a rule: no added work on a verbal yes.

  2. 2

    Photograph the reason

    A photo of the rotted plenum or the full panel ends most arguments before they start.

  3. 3

    Price it from the price book

    Use the same task prices as the original estimate so the change looks consistent.

  4. 4

    Get the signature on the spot

    On the tech's phone or tablet, or by a link the customer can approve from wherever they are.

  5. 5

    Tie it to the job

    The change should land on the same job and invoice, numbered in sequence.

How change orders work in TradesWork

TradesWork doesn't have a dedicated change-order document or progress billing today. The shipped workflow that covers most service and replacement changes is to build the extra work as a new priced proposal on the same job, attach proof photos of what was found, and get approval: a drawn signature on the tech's phone, or a typed-name approval from the job's One Link. A sold option goes onto that job's invoice, so the final bill reflects what the customer approved.

Footnotes

  1. California Business and Professions Code § 7159, subsections (c)(5), (d) and (e)(3)(B), text via California Public Law, accessed October 15, 2026. ↩

  2. FAR 2.101, Definitions, Federal Acquisition Regulation, Acquisition.gov, accessed October 15, 2026. ↩

Frequently asked questions

The original job or contract it changes, a plain description of the added or removed work, the reason (ideally with photos), the price added or subtracted, the new total, any effect on the completion date or payment schedule, and the customer's signature and date. Number change orders in sequence so the final invoice ties back to each one.

Sources

Last reviewed October 15, 2026. Third-party sources are marked; some are written by competing vendors.

  1. 1.California Business and Professions Code § 7159, home improvement contracts (text via California Public Law)
  2. 2.FAR 2.101, Definitions: change order (Acquisition.gov)

Ready to run a tighter shop?

Try the TradesWork AI plan free for 14 days. Bring your customers and price book, or start fresh with a price book made for your trade.

  • No credit card
  • No contract
  • Cancel any time
Three workers in coveralls unloading equipment from a van